SMS List

Mobile Number Message Body Gauge ID Lake Name Height Precipi Date Time Notes
+14034624784
LTT2 22
LTT2
Islet Lake
22.000
NA
08-11-2023
13:50:32
+19193217947
GJN2 2.16
GJN2
Brumley Preserve North Pond
2.160
NA
08-11-2023
12:46:00
+19192728167
Pcj2 7.93 project staff installed the gauge at this time. Staff reference the gauge to an eyeball in the nearby tree. The eyeball is right next to the hole in the tree The eyeball is 57 and 1/2 in above the water level which is 7.93
PCJ2
Mashipacong Pond
7.930
NA
08-11-2023
11:36:22
project staff installed the gauge at this time. Staff reference the gauge to an eye bolt in the nearby tree. The eye bolt is right next to the hole in the tree The eye bolt is 57 and 1/2 in above the water level which is 7.93
+16034433677
BAH2 1.16
BAH2
Baptist Pond
1.160
NA
08-11-2023
07:09:26
+12246393158
HAL2 1.48
HAL2
Hastings Lake
1.480
NA
08-11-2023
06:36:18
+18473125664
Tml2 1.70
TML2
Timber Lake
1.700
NA
08-10-2023
17:52:08
+18052596256
WAW2 0.9
WAW2
Lake Washington
0.900
NA
08-10-2023
16:43:11
+16035542970
NPH2 1.55 Level 1.1 in rain prior to measurement (Tuesday night) Calm (tcs)
NPH2
Norway Pond
1.550
NA
08-10-2023
16:23:38
Level 1.1 in rain prior to measurement (Tuesday night) Calm (tcs)
+12533322378
TWW2 .83
TWW2
North Lake
0.830
NA
08-10-2023
16:21:59
+18156037215
HKL2 0.55
HKL2
Herrick lake
0.550
NA
08-10-2023
14:59:08
+19192728167
Lsj2 8.76 project staff install the gauge at this time. The benchmark is a radish rock that is across the channel and closer to the bench from the gauge. The highest point on that rock is 6 and 1/2 in above the water level at this time
LSJ2
Little Swartswood Lake
8.760
NA
08-10-2023
13:59:10
project staff install the gauge at this time. The benchmark is a radish rock that is across the channel and closer to the bench from the gauge. The highest point on that rock is 6 and 1/2 in above the water level at this time
+19802148356
SWJ2 8.28
SWJ2
Swartswood Lake
8.280
NA
08-10-2023
12:40:35
+19192728167
Swj2 8.26 project staff installed the gauge at this time. The concrete seawall nearest the gauge is 7 and 5/8 in above the top of the gauge
SWJ2
Swartswood Lake
8.260
NA
08-10-2023
12:39:10
project staff installed the gauge at this time. The concrete seawall nearest the gauge is 7 and 5/8 in above the top of the gauge
+12539066479
STW2 .78
STW2
Steel Lake
0.780
NA
08-10-2023
12:27:01
+56988080143
CHC2 95
CHC2
Laguna Chica
95.000
NA
08-10-2023
12:05:47
+14254176416
Phw2 .17 ft, calm, high clouds, 67 deg
PHW2
Phantom Lake
0.170
NA
08-10-2023
11:15:57
ft, calm, high clouds, 67 deg
+19192728167
Dpj2 8.46 project staff installed the gauge on the dam at this time. The top of the gauge is 10 and 1/4 in below the top of the concrete dam where it was installed. 10:19 am
DPJ2
Deer Park Pond
8.460
NA
08-10-2023
10:19:45
project staff installed the gauge on the dam at this time. The top of the gauge is 10 and 1/4 in below the top of the concrete dam where it was installed. 10:19 am
+16098266293
DPJ2 8.46
DPJ2
Deer Park Pond
8.460
NA
08-10-2023
10:11:52
+16097094642
DPJ2 8.46
DPJ2
Deer Park Pond
8.460
NA
08-10-2023
10:11:01
+16034938014
SHH2 4.06
SHH2
Shaws Pond
4.060
NA
08-10-2023
09:58:37
+13026904452
Mph2 5.74
MPH2
Messer Pond
5.740
NA
08-10-2023
08:12:01
+14252879941
Ecw2 1.00
ECW2
Echo Lake
1.000
NA
08-10-2023
07:45:25
+19192728167
Tcj2 8.45 4:50 pm project staff installed gauge at this time. The highest point of the nearest boulder on the shore is 9/16 of an inch above the top of the gauge
TCJ2
Tilcon Lake
8.450
NA
08-09-2023
18:07:35
4:50 pm project staff installed gauge at this time. The highest point of the nearest boulder on the shore is 9/16 of an inch above the top of the gauge
+16074343685
ARK2 12.47
ARK2
Arnold lake
12.470
NA
08-09-2023
17:01:19
+19802148356
TCJ2 8.46
TCJ2
Tilcon Lake
8.460
NA
08-09-2023
16:55:29