Brumley Preserve South Pond     Gauge ID: BNN2



Height Date Notes
1.82
11-23-2024
1.82
11-19-2024
1.82
11-18-2024
1.86
11-17-2024
1.80
11-06-2024
1.83
10-30-2024
project staff clean the gauge and tested the locss app
1.83
10-30-2024
Project staff cleaned off gauge and sign
1.83
10-30-2024
Project staff scrubbed gauge
1.84
10-29-2024
1.84
10-28-2024
1.84
10-23-2024
1.87
10-21-2024
2.10
10-10-2024
2.22
10-07-2024
1.90
09-15-2024
1.90
09-08-2024
1.90
09-03-2024
2.20
08-17-2024
1.90
08-01-2024
160.00
07-17-2024
1.55
07-06-2024
1.80
06-18-2024
2.05
06-01-2024
2.10
05-31-2024
2.40
04-02-2024
2.30
03-12-2024
2.18
02-20-2024
2.20
02-16-2024
2.28
02-07-2024
2.32
02-04-2024
2.26
01-05-2024
1.60
12-07-2023
1.60
11-30-2023
1.64
11-29-2023
1.65
10-13-2023
1.71
09-15-2023
1.70
08-31-2023
2.19
07-20-2023
2.05
06-04-2023
2.09
06-03-2023
2.32
05-10-2023
2.41
05-04-2023
2.50
04-27-2023
2.66
04-19-2023
1.63
11-24-2022
1.63
11-24-2022
1.66
11-21-2022
1.66
11-06-2022
1.66
10-31-2022
1.70
10-24-2022
2.30
10-22-2022
project staff cleaned the gauge
1.78
10-09-2022
combined from two texts from same phone number
1.81
10-08-2022
205.00
10-07-2022
1.60
09-25-2022
1.78
09-14-2022
1.80
08-31-2022
1.80
08-28-2022
1.82
08-26-2022
1.92
08-13-2022
1.96
08-12-2022
1.99
08-10-2022
1.92
07-18-2022
1.92
07-17-2022
1.75
07-06-2022
1.80
07-03-2022
1.80
06-26-2022
1.82
06-26-2022
2.03
06-12-2022
2.00
06-10-2022
2.05
06-10-2022
2.08
06-07-2022
2.08
06-07-2022
2.12
06-05-2022
2.15
06-04-2022
2.18
06-01-2022
2.20
05-31-2022
2.08
05-23-2022
2.14
05-18-2022
2.17
05-10-2022
2.20
05-06-2022
2.24
05-04-2022
2.25
05-01-2022
2.26
04-29-2022
2.32
04-24-2022
2.34
04-23-2022
2.34
04-23-2022
2.35
04-22-2022
2.28
04-17-2022
2.37
04-14-2022
2.46
04-11-2022
2.56
03-29-2022
2.64
03-22-2022
2.25
03-04-2022
2.22
02-22-2022
2.20
02-21-2022
2.24
02-20-2022
2.22
02-19-2022
2.25
02-17-2022
2.28
02-14-2022
2.30
02-12-2022
2.30
02-12-2022
Staff Note: This measurement was submitted for Gauge NBB2, but was corrected by project staff
2.30
02-12-2022
2.28
02-12-2022
2.24
01-15-2022
2.25
01-14-2022
2.26
01-13-2022
2.23
01-09-2022
1.85
01-01-2022
1.80
12-27-2021
1.80
12-26-2021
1.80
12-25-2021
1.78
12-19-2021
1.75
12-17-2021
1.76
12-15-2021
1.78
12-12-2021
1.75
12-10-2021
1.75
12-07-2021
1.76
12-05-2021
1.77
12-04-2021
1.78
12-04-2021
1.76
12-03-2021
1.78
11-29-2021
1.80
11-27-2021
1.80
11-25-2021
1.80
11-25-2021
1.80
11-25-2021
1.75
11-21-2021
1.80
11-19-2021
1.81
11-15-2021
1.84
11-12-2021
1.86
11-09-2021
1.90
11-02-2021
1.76
10-25-2021
1.78
10-23-2021
1.79
10-21-2021
1.82
10-18-2021
1.85
10-15-2021
1.70
09-20-2021
1.95
08-28-2021
2.10
06-28-2021
feet
2.15
06-26-2021
2.14
06-26-2021
2.16
06-24-2021
2.20
06-23-2021
2.13
06-17-2021
2.18
06-15-2021
2.20
06-13-2021
2.26
06-08-2021
2.17
06-03-2021
2.20
05-30-2021
2.19
05-24-2021
2.20
05-23-2021
2.22
05-22-2021
2.26
05-19-2021
2.28
05-16-2021
2.31
05-14-2021
2.34
05-11-2021
2.35
05-09-2021
2.35
05-09-2021
2.36
05-09-2021
2.38
05-07-2021
2.35
05-02-2021
2.35
05-01-2021
2.40
04-30-2021
2.44
04-27-2021
2.41
04-23-2021
2.44
04-20-2021
2.44
04-19-2021
2.45
04-17-2021
2.54
04-12-2021
2.54
04-12-2021
2.58
04-09-2021
2.52
04-07-2021
2.54
04-07-2021
2.55
04-06-2021
2.56
04-06-2021
2.58
04-05-2021
2.58
04-04-2021
2.38
03-24-2021
2.38
03-23-2021
2.40
03-21-2021
2.34
03-15-2021
2.35
03-13-2021
2.35
03-13-2021
2.36
03-12-2021
2.36
03-11-2021
2.37
03-10-2021
2.37
03-09-2021
2.40
03-09-2021
2.38
03-09-2021
2.40
03-08-2021
2.40
03-08-2021
2.42
03-07-2021
2.42
03-06-2021
2.44
03-06-2021
2.44
03-06-2021
2.47
03-05-2021
2.53
02-26-2021
2.56
02-25-2021
2.27
01-25-2021
2.27
01-24-2021
2.29
01-23-2021
2.30
01-22-2021
2.30
01-21-2021
2.32
01-20-2021
2.38
01-15-2021
2.40
01-14-2021
2.60
12-30-2020
2.59
12-30-2020
2.25
12-13-2020
2.28
12-10-2020
2.30
12-10-2020
2.30
12-10-2020
2.30
12-04-2020
2.30
12-04-2020
2.31
12-03-2020
2.20
11-29-2020
2.18
11-29-2020
2.20
11-27-2020
2.20
11-27-2020
2.20
11-27-2020
2.18
11-25-2020
2.20
11-23-2020
2.36
11-17-2020
2.39
11-16-2020
2.12
11-10-2020
2.14
11-10-2020
2.14
11-09-2020
2.13
11-08-2020
meters
2.15
11-06-2020
2.15
11-05-2020
2.18
11-02-2020
Project staff installed the gauge at this time and surveyed in using various methods. The 3.30 mark on the gauge is level with the eye bolt installed on the pier to the right of the gauge.
2.18
11-02-2020