| Mobile Number | Message Body | Gauge ID | Lake Name | Height | Precipi | Date | Time | Notes |
|---|---|---|---|---|---|---|---|---|
+14254176416 |
Phw2 .17 ft, calm, high clouds, 67 deg |
PHW2 |
Phantom Lake |
0.170 |
NA |
08-10-2023
|
11:15:57 |
ft, calm, high clouds, 67 deg |
+19192728167 |
Dpj2 8.46 project staff installed the gauge on the dam at this time. The top of the gauge is 10 and 1/4 in below the top of the concrete dam where it was installed.
10:19 am |
DPJ2 |
Deer Park Pond |
8.460 |
NA |
08-10-2023
|
10:19:45 |
project staff installed the gauge on the dam at this time. The top of the gauge is 10 and 1/4 in below the top of the concrete dam where it was installed. 10:19 am |
+16098266293 |
DPJ2 8.46 |
DPJ2 |
Deer Park Pond |
8.460 |
NA |
08-10-2023
|
10:11:52 |
|
+16097094642 |
DPJ2 8.46 |
DPJ2 |
Deer Park Pond |
8.460 |
NA |
08-10-2023
|
10:11:01 |
|
+16034938014 |
SHH2 4.06 |
SHH2 |
Shaws Pond |
4.060 |
NA |
08-10-2023
|
09:58:37 |
|
+13026904452 |
Mph2 5.74 |
MPH2 |
Messer Pond |
5.740 |
NA |
08-10-2023
|
08:12:01 |
|
+14252879941 |
Ecw2 1.00 |
ECW2 |
Echo Lake |
1.000 |
NA |
08-10-2023
|
07:45:25 |
|
+19192728167 |
Tcj2 8.45 4:50 pm project staff installed gauge at this time.
The highest point of the nearest boulder on the shore is 9/16 of an inch above the top of the gauge |
TCJ2 |
Tilcon Lake |
8.450 |
NA |
08-09-2023
|
18:07:35 |
4:50 pm project staff installed gauge at this time. The highest point of the nearest boulder on the shore is 9/16 of an inch above the top of the gauge |
+16074343685 |
ARK2 12.47 |
ARK2 |
Arnold lake |
12.470 |
NA |
08-09-2023
|
17:01:19 |
|
+19802148356 |
TCJ2 8.46 |
TCJ2 |
Tilcon Lake |
8.460 |
NA |
08-09-2023
|
16:55:29 |
|
+19192728167 |
Tcj2 8.45 project staff installed gauge at this time.
The highest point of the nearest boulder on the shore is 9/16 of an inch above the top of the gauge |
TCJ2 |
Tilcon Lake |
8.450 |
NA |
08-09-2023
|
16:50:36 |
project staff installed gauge at this time. The highest point of the nearest boulder on the shore is 9/16 of an inch above the top of the gauge |
+19192728167 |
Ctj2 8.83 correction to previous measurement. The 8.83 Mark on the locks gauge is the same level as the 3.15 mark on the state park gauge at the dam |
CTJ2 |
Lake Musconetcong |
8.830 |
NA |
08-09-2023
|
15:16:42 |
correction to previous measurement. The 8.83 Mark on the locks gauge is the same level as the 3.15 mark on the state park gauge at the dam |
+19192728167 |
Ctj2 8.83 project staff installed gauge at this time.
The water level on the state park staff gauge on the nearby dam currently reads 3.17 |
CTJ2 |
Lake Musconetcong |
8.830 |
NA |
08-09-2023
|
15:12:28 |
project staff installed gauge at this time. The water level on the state park staff gauge on the nearby dam currently reads 3.17 |
+19106048358 |
SAN2 - 0.10 |
SAN2 |
Salters Lake |
0.100 |
NA |
08-09-2023
|
13:03:24 |
|
+15129489377 |
Gnh2 level 6.22 |
GNH2 |
Governors Lake |
6.220 |
NA |
08-09-2023
|
12:21:17 |
|
+12063057116 |
PRN2 2.16 |
PRN2 |
Prairie Ridge Pond |
2.160 |
NA |
08-09-2023
|
11:27:17 |
|
+19192728167 |
Msj2 8.71 project staff 10:14 am |
MSJ2 |
Mt. Misery Lake |
8.710 |
NA |
08-09-2023
|
11:24:05 |
project staff 10:14 am |
+19802148356 |
MSJ2 8.71 |
MSJ2 |
Mt. Misery Lake |
8.710 |
NA |
08-09-2023
|
10:28:24 |
|
+19192728167 |
Msj2 8.71 project staff install the gauge at this time |
MSJ2 |
Mt. Misery Lake |
8.710 |
NA |
08-09-2023
|
10:14:23 |
project staff install the gauge at this time |
+16099315073 |
MSJ2 8.71 a lot of rain 2 days ago |
MSJ2 |
Mt. Misery Lake |
8.710 |
NA |
08-09-2023
|
10:12:40 |
a lot of rain 2 days ago |
+17807810272 |
LTT2 21 |
LTT2 |
Islet Lake |
21.000 |
NA |
08-09-2023
|
10:05:18 |
|
+19193846636 |
GJN2 2.10 |
GJN2 |
Brumley Preserve North Pond |
2.100 |
NA |
08-09-2023
|
08:44:41 |
|
+16038010936 |
MPH2 5.78 |
MPH2 |
Messer Pond |
5.780 |
NA |
08-09-2023
|
08:24:35 |
|
+16033481353 |
Arh2 5.58 |
ARH2 |
Lake Armington |
5.580 |
NA |
08-09-2023
|
08:23:38 |
|
+15082592580 |
FMA2 1.54 |
FMA2 |
Farm Pond |
1.540 |
NA |
08-09-2023
|
08:06:32 |