SMS List

Mobile Number Message Body Gauge ID Lake Name Height Precipi Date Time Notes
+19192728167
Mrk2 3.17 project staff put the drifter in the lake at 2:31 p.m.
MRK2
Lake Moraine
3.170
NA
06-02-2022
14:34:35
project staff put the drifter in the lake at 2:31 p.m.
+19192728167
Ark2 12.17 very small waves. Project staff remove the GPS drifter at 11:52 a.m.
ARK2
Arnold lake
12.170
NA
06-02-2022
11:54:59
very small waves. Project staff remove the GPS drifter at 11:52 a.m.
+16034433677
BAH2 1.06
BAH2
Baptist Pond
1.060
NA
06-02-2022
11:53:55
+19195862920
BRK2 8.32 project staff installed the gauge, surveyed to metal wall on shore which is level to 9.92 on the gauge
BRK2
Cassadega Lake
8.320
NA
06-02-2022
11:17:25
project staff installed the gauge, surveyed to metal wall on shore which is level to 9.92 on the gauge
+17166735549
BRK2 8.32
BRK2
Cassadega Lake
8.320
NA
06-02-2022
11:15:21
+16074343685
ARK2 12.17 Calm water
ARK2
Arnold lake
12.170
NA
06-02-2022
10:55:11
Calm water
+19192728167
Ark2 12.17 very small waves. Project staff added the GPS drifter to the lake at 10:50 a.m.
ARK2
Arnold lake
12.170
NA
06-02-2022
10:54:40
very small waves. Project staff added the GPS drifter to the lake at 10:50 a.m.
+19195862920
CQK2 8.40 project staff installed the gauge, reference point is top of concrete dock which is level to top of gauge
CQK2
Chautauqua Lake
8.400
NA
06-02-2022
09:55:42
project staff installed the gauge, reference point is top of concrete dock which is level to top of gauge
+17166735549
CQK2 8.40
CQK2
Chautauqua Lake
8.400
NA
06-02-2022
09:53:39
+18454309075
Gnh2 5.22 ml
GNH2
Governors Lake
5.220
NA
06-01-2022
21:47:33
ml
+19192728167
Nak2 10.62 project staff removed the late gauge at 5:48
NAK2
Panther Lake
10.620
NA
06-01-2022
18:00:59
project staff removed the late gauge at 5:48
+19192728167
Nak2 10.62 project staff put the drifter in the lake at 4:48 p.m.
NAK2
Panther Lake
10.620
NA
06-01-2022
16:51:23
project staff put the drifter in the lake at 4:48 p.m.
+19195862920
HLK2 2.34 project staff installed the gauge, survey point is lowest horizontal sealant expansion crack on concrete dyke referenced to 4 5/8" above the 3.30 marker on the gauge
HLK2
Hemlock Lake
2.340
NA
06-01-2022
13:46:42
project staff installed the gauge, survey point is lowest horizontal sealant expansion crack on concrete dyke referenced to 4 5/8" above the 3.30 marker on the gauge
+19192728167
Lnk2 1.27 measurement was taken at 12:45 p.m. project staff removed the drifter from the water. Previous measurement should say that the drifter was put in the water at 11:46 a.m.. Water is significantly calmer now than it was an hour ago
LNK2
Dyken Pond
1.270
NA
06-01-2022
12:49:13
measurement was taken at 12:45 p.m. project staff removed the drifter from the water. Previous measurement should say that the drifter was put in the water at 11:46 a.m.. Water is significantly calmer now than it was an hour ago
+19195862920
CDK2 1.68 surveyed in with nearby tree, eye bolt is level at 2.10 on the gauge
CDK2
Canadice Lake
1.680
NA
06-01-2022
12:44:04
surveyed in with nearby tree, eye bolt is level at 2.10 on the gauge
+19195862920
CDK2 1.68 project staff installed the gauge
CDK2
Canadice Lake
1.680
NA
06-01-2022
12:43:07
project staff installed the gauge
+19192728167
Lnk2 1.27 measurement taken at 146 p.m. project staff put the gauge in at this time
LNK2
Dyken Pond
1.270
NA
06-01-2022
12:25:02
measurement taken at 11:46 am project staff put the gauge in at this time
+19193086699
LNK2 1.28 rainy day
LNK2
Dyken Pond
1.280
NA
06-01-2022
12:21:35
rainy day
+19292309450
RDL2 0.74
RDL2
Round Lake
0.740
NA
06-01-2022
12:10:31
+12246393158
TML2 2.22
TML2
Timber Lake
2.220
NA
06-01-2022
11:39:41
+18156797208
RDL2 0.75
RDL2
Round Lake
0.750
NA
06-01-2022
11:31:52
+18156797208
LDL2 1.83
LDL2
Highland Lake
1.830
NA
06-01-2022
11:17:24
+14253671181
Klw2 1.80
KLW2
Lake Ki
1.800
NA
06-01-2022
11:14:57
+18156797208
YSL2 2.16
YSL2
Grays Lake
2.160
NA
06-01-2022
11:03:36
+18156797208
DAL2 1.95
DAL2
Diamond Lake
1.950
NA
06-01-2022
10:36:47