SMS List

Mobile Number Message Body Gauge ID Lake Name Height Precipi Date Time Notes
+19195862920
CDK2 1.68 project staff installed the gauge
CDK2
Canadice Lake
1.680
NA
06-01-2022
12:43:07
project staff installed the gauge
+19192728167
Lnk2 1.27 measurement taken at 146 p.m. project staff put the gauge in at this time
LNK2
Dyken Pond
1.270
NA
06-01-2022
12:25:02
measurement taken at 11:46 am project staff put the gauge in at this time
+19193086699
LNK2 1.28 rainy day
LNK2
Dyken Pond
1.280
NA
06-01-2022
12:21:35
rainy day
+19292309450
RDL2 0.74
RDL2
Round Lake
0.740
NA
06-01-2022
12:10:31
+12246393158
TML2 2.22
TML2
Timber Lake
2.220
NA
06-01-2022
11:39:41
+18156797208
RDL2 0.75
RDL2
Round Lake
0.750
NA
06-01-2022
11:31:52
+18156797208
LDL2 1.83
LDL2
Highland Lake
1.830
NA
06-01-2022
11:17:24
+14253671181
Klw2 1.80
KLW2
Lake Ki
1.800
NA
06-01-2022
11:14:57
+18156797208
YSL2 2.16
YSL2
Grays Lake
2.160
NA
06-01-2022
11:03:36
+18156797208
DAL2 1.95
DAL2
Diamond Lake
1.950
NA
06-01-2022
10:36:47
+12246393158
HAL2 2.36
HAL2
Hastings Lake
2.360
NA
06-01-2022
09:06:30
+16034433677
BAH2 1.14
BAH2
Baptist Pond
1.140
NA
06-01-2022
07:34:46
+19195908109
BNN2 2.18
BNN2
Brumley Preserve South Pond
2.180
NA
06-01-2022
06:15:27
+13026904452
Mph2 4.99
MPH2
Messer Pond
4.990
NA
05-31-2022
20:18:33
+18473933753
Hal2 2.38
HAL2
Hastings Lake
2.380
NA
05-31-2022
20:17:07
+19193086699
RLK2 4.34
RLK2
Raquette lake
4.340
NA
05-31-2022
19:42:54
+19192728167
Rlk2 4.35 project staff removed drifter at 7:29
RLK2
Raquette lake
4.350
NA
05-31-2022
19:32:30
project staff removed drifter at 7:29
+19192728167
Rlk2 4.35 project staff put the drifter in the lake at 6:42
RLK2
Raquette lake
4.350
NA
05-31-2022
18:46:07
project staff put the drifter in the lake at 6:42
+16074343685
ARK2 12.09
ARK2
Arnold lake
12.090
NA
05-31-2022
18:15:02
+19192728167
Nbk2 2.14 project staff remove the drifter from the water at 414 p.m.
NBK2
Eagle Pond
2.140
NA
05-31-2022
16:18:46
project staff remove the drifter from the water at 414 p.m.
+19195862920
ABK2 1.02 reference measurement by staff is 8 3/8" below the top of the dock
ABK2
Seneca Lake - South
1.020
NA
05-31-2022
15:26:37
reference measurement by staff is 8 3/8" below the top of the dock
+19193086699
NBK2 2.14 little waves
NBK2
Eagle Pond
2.140
NA
05-31-2022
15:22:37
little waves
+19192728167
Nbk2 2.14 small waves from 2.12 to 2.16. project staff put the GPS drifter in at 3:15 p.m.
NBK2
Eagle Pond
2.140
NA
05-31-2022
15:21:07
small waves from 2.12 to 2.16. project staff put the GPS drifter in at 3:15 p.m.
+16035542970
NPH2 1.81 Level Calm (tcs)
NPH2
Norway Pond
1.810
NA
05-31-2022
15:19:08
Level Calm (tcs)
+19195862920
ABK2 1.02 project staff installed the gauge
ABK2
Seneca Lake - South
1.020
NA
05-31-2022
15:16:18
project staff installed the gauge