Height | Date | Notes |
---|---|---|
0.39
|
05-22-2019
|
|
0.80
|
05-17-2019
|
|
0.62
|
05-07-2019
|
|
0.70
|
05-02-2019
|
|
0.70
|
04-28-2019
|
|
1.08
|
03-10-2019
|
waves ranging between 1.02 and 1.14
|
1.08
|
03-10-2019
|
LOCCS team taking gps elevation
|
1.10
|
03-07-2019
|
|
1.10
|
02-27-2019
|
|
1.12
|
02-26-2019
|
|
1.30
|
02-04-2019
|
|
1.14
|
01-12-2019
|
|
1.30
|
01-10-2019
|
|
1.25
|
12-20-2018
|
- project team swapping signs
|
1.25
|
12-20-2018
|
project team swapping signs
|
1.23
|
12-20-2018
|
- project team swapping signs
|
1.18
|
12-13-2018
|
|
1.04
|
11-06-2018
|
+/- 0.06 wave action
|
1.08
|
08-02-2018
|
|
0.64
|
07-17-2018
|
|
1.00
|
06-29-2018
|
|
1.02
|
06-27-2018
|
project staff cleaned gauge and tested for plumb and level
|
1.20
|
06-15-2018
|
|
1.16
|
05-30-2018
|
|
0.86
|
05-14-2018
|
~8" wind driven waves
|
1.02
|
03-27-2018
|
|
1.18
|
02-13-2018
|
project staff cleaned the gauge and checked for level. Gauge is (close enough to) plumb and level even though the bubble level has been shot.
|
1.16
|
02-07-2018
|
|
0.94
|
12-21-2017
|
|
1.05
|
12-12-2017
|
|
0.80
|
12-05-2017
|
|
0.96
|
11-19-2017
|
choppy waves
|
0.94
|
11-15-2017
|
very calm. Level has been shot up, but gauge appears to be plumb and level
|
1.00
|
11-10-2017
|
calm
|
1.08
|
11-03-2017
|
|
1.08
|
11-03-2017
|
calm
|
0.94
|
10-25-2017
|
light waves
|
0.90
|
10-18-2017
|
Text: calm
|
1.05
|
10-12-2017
|
|
1.12
|
10-02-2017
|
Email submission:
Some minor wave action, took several readings over 20+ minutes to get a reasonable average.
Lots of bullet impact craters on the metal but it is still readable.
Bubble placed to far right of gauge, but as the post and horizontal measurement markings all looked plumb/true, I suspect that the level has been damaged and that the post is OK.
|
1.10
|
10-02-2017
|
|
1.29
|
09-18-2017
|
Project staff installed the gauge at this time.
|