Peach Lake     Gauge ID: CHK2



Height Date Notes
1.18
05-21-2025
NOTICE: A temporary dam and bypass pipe installed at Cobb Road for work to replace the culvert is restricting the water flow in Peach Lake Brook. This has reduced the discharge rate and is keeping the lake abnormally high.
1.26
05-17-2025
1.24
05-15-2025
After 0.3" rain on 5/14.
1.25
05-13-2025
1.28
05-12-2025
After 2.4" rain on 5/8 & 5/9.
1.35
05-10-2025
0.79
05-07-2025
After 2.8" rain on 5/2 to 5/6.
0.49
04-27-2025
After 0.96" rain on 4/26.